A note for drivers this weekend.
The original bridge at the highway 89 – 400 interchange is being dismantled and the work is expected to interrupt traffic flow in all directions.
Construction is expected to begin at 8 o’clock Saturday (oct1) evening and be completed by 8 o’clock Sunday (oct2) morning.
All 6 lanes of traffic on the 400 will be redirected over the northbound and southbound offramps of Hwy 89.
Police will then assist drivers with getting back onto the highway.
Highway 89 will also be closed between the intersections that cross overtop of the 400.
Detour signs will be in place to help guide traffic.